DEVELOPMENT OF A PEST MANAGEMENT PLAN

Applicant: Western Forest Products Inc., Mid Island Forest Operation,

8010 Island Highway, Campbell River, V9W 5E1, PO Box 6000

Primary Contact: Taisa L. Brown, RPF at tlbrown@westernforest.com or 250-287-5063

A draft Pest Management Plan has been prepared by the applicant for the purpose of vegetation management, using the principles of Integrated Pest Management. The plan applies to harvested areas within Mid Island’s Tree Farm License 39 Block 2. The proposed duration is from August 15, 2020 to August 14, 2025.

The closest community to the plan area is Sayward, which is protected within the herbicide exclusion zone (HEZ).  The HEZ (9380 hectares) was developed in 2015 with input from Sayward and Campbell River residents and captures water intakes, the community watershed, the Salmon Brewster horse trail, and other areas of public sensitivity.  Only non-chemical treatments will be conducted in this zone, except to treat invasive species. 

The herbicides and application methods proposed for use under this plan include:

Triclopyr- Garlon XRT, Garlon RTU, Release, Release MSO

Glyphosate-VP480, VisionMax, Vision

Triclopyr application methods may include basal bark or cut stump.

Glyphosate application methods may include ground foliar spray or cut stump.

Non-chemical methods include manual girdling, mechanical cutting, manual cutting, stem bending, and pulling.

Given Covid-19, the draft PMP, maps, and background information will be available online at www.miflag.org

A person wishing to contribute information about a proposed treatment site, relevant to the development of the Pest Management Plan, may send copies of the information to the applicant at the address/email above within 30 days of the publication of this notice.

WFP MIFO PMP Advertisement

Share